A subpanel does not create more utility capacity
It distributes circuits. Whether a service upgrade is needed depends on a professional load review and the existing equipment.

Adding an ADU, converting a garage or installing new electric equipment can change the demands on your electrical system. QPS coordinates panel replacement, subpanel installation and the construction around the work with the appropriate electrical professional.
Get a free project estimate Call (747) 273-7759
Review existing condition, proposed loads, equipment location and the service arrangement before specifying a replacement.
Plan distribution to an ADU, garage, addition or another area, including feeder routing, access and any associated construction.
Compare the proposed demand with available capacity and coordinate utility requirements when the service changes.
Your estimate identifies included work, exclusions and specialist responsibilities.
It distributes circuits. Whether a service upgrade is needed depends on a professional load review and the existing equipment.
Trenching, wall repairs, equipment relocation, utility scheduling and inspection access can affect the cost and sequence.
Share photos of the closed panel, the project city and the equipment you plan to add. Do not remove electrical covers.
Discuss your projectExplore related colors, materials & details ↗
Free initial project estimate. Design, engineering, testing and agency fees are separately scoped when required.
Possibly. Panel replacement and rewiring are different scopes. The electrical professional reviews existing wiring and any corrections needed for the permitted work.
It may be an option following load calculations, routing review and utility or local requirements. Metering and service arrangements are confirmed for the property.
Serving Orange County and the Los Angeles area. Applicable codes, permits and licensed-trade responsibilities are confirmed for the property and scope.
Tell us about your project, city and timing.
Free initial discussion & project estimate. Design, engineering and permit fees are separately scoped when needed.