How do we find out what ADU fits my property?
Start with the address, site photos, existing records and your goals. We review the available space, access, existing structures and utility routes, then identify design questions and current state and local requirements to confirm.
Can you use my plans or a preapproved ADU plan?
Yes. We can work with your design team or coordinate a new design. A preapproved plan still needs review for the actual property, including placement, foundation, utility connections and the local submission package.
Is converting a garage always cheaper than building a new ADU?
No. A suitable existing shell may be useful, but slab, structural, moisture, opening and utility upgrades can change the cost. We assess those conditions before comparing a conversion with new construction.
Will the ADU need separate meters or a panel upgrade?
That depends on the design, existing service capacity, utility provider and applicable requirements. The electrical and plumbing professionals review the proposed loads, service arrangement, connection routes and any upgrades before they are included in the scope.
Who handles the permits and inspections?
QPS coordinates the agreed applications, plan-check responses, inspection requests and correction items with the design team and responsible trades. The city or county determines approval, inspection and occupancy requirements.
Can we stay in the main house during the work?
Often this can be planned, but access, dust, noise, safety and temporary utility interruptions need review. We discuss construction areas, deliveries and the sequence before work starts.