Choose addition or conversion
Establish whether the property suits a new attached addition or a conversion of suitable existing space.

A documented attached ADU in Campbell shows how a studio can include a work nook, a full bathroom and a dedicated storage / laundry area.

Susan’s attached studio · Campbell. Explore the room arrangement, then review the practical points alongside it.

Published case-study floor plan · attributed reference preview
Source: Santa Clara County ADU · San Mateo County ADU Resource Center.
400 sq ft reported by the case study. This illustration has no construction dimensions; a new project needs measured, coordinated drawings. The preview is for comparing layouts; use the complete project-specific approved documents for construction.
A published example of an existing attached ADU. It is not a preapproved or transferable construction drawing set.
Reference plan credited to the Santa Clara County Planning Collaborative and San Mateo County ADU Resource Center. QPS did not build or design this home. Reuse rights must be resolved before adapting source drawings.
Source checked October 30, 2026. Confirm current requirements before submission.
Establish whether the property suits a new attached addition or a conversion of suitable existing space.
Check structure, required separation, sound control and independent access.
Use the layout as a discussion reference, then coordinate current-code drawings and permits for your property.
Share the address, photos and goals. We compare the reference with the actual lot or existing structure.
Check source-plan use terms. Select an eligible city template or commission a separate property-specific design.
Arrange the required design professionals, engineering, utility and energy documents, then coordinate permit review.
Follow the approved scope, coordinate inspections before work is covered, complete finishes and arrange final closeout.
Tell us your city, preferred layout and budget. The initial discussion and project estimate are free; design, engineering, surveys and permit fees are scoped separately.